Free of Charge Service

Important 

Role of...


The first step in the way to a reliable exhaust pipe system is a drawing (2-D) or model (3-D) of the exhaust pipe arrangement. From the given specifications, our engineers derive the technical configuration of the elastic support system in close collaboration with the shipyard's technical staff. 

Our experience shows that shipyard having previously done this work on their own can not only save a lot of time but also some money, as SB Broneske in many cases come up with a system consisting of less mechanical equipment.

This layout proposal also plays an important role during the installation phase as all devices are already drawn into the pipe arrangement and installation engineers can easily identify the different installation positions and the corresponding equipment.